International Commission on Irrigation & Drainage Commission Interationale des Irrigation et du Drainage



(3211) Maximum flow line, Full supply line, Designed maximum flow line, Designed full supply level, Actual maximum flow line, or Actual full supply line
1 - The line describing the water surface elevation under the steady flow conditions of maximum normal flow or discharge. If after construction, the prevailing maximum flow line in the field differs from that designed, the maximum flow line is further classified for the sake of distinction as `designed maximum flow line` and `actual maximum flow line`. 2 - See 3311.

Related items you may like

Irrigation

Dictionary - Levels of Capacity Development Terms

Sign up for newsletter

Follow us